Skip to main content

ChapterFixed Assets & Depreciation

Chapter 18 — The memo

The module on one page: keep it next to your screen.

Book contents

Memo

Before the first asset

An administrator chooses the firm's accounting file (Settings › Dossier and threshold). Default categories places the categories. The file has an open financial year.

Bringing an asset in

New fixed asset, from its document: validated purchase invoice and its line, leasing contract, deed, other document. Code IM-YYYY-NNNNNN. A line « 4 » gives 4 assets.

Gross value

Price excl. VAT + costs + non-recoverable VAT. Below 500,000 DT excl. VAT: a warning, never a refusal.

The lock

A validated depreciation table freezes category, rate, method, date and acquisition details. The asset can no longer be deleted: it leaves through a disposal.

Place and entrust

Locations: site › building › floor › office. An assignment suggests the place; same site: at once; another site: a transfer (request, validation, dispatch, receipt).

Maintenance

Work order: Requested › Scheduled › In progress › Completed. The cost enters the register at the end. Above 2 000,000 DT estimated: approval first.

Insurance

Coverage: Covered, expiring soon, Insufficient limit (below 90 % of gross value), Not insured. Claim: the policy of the day is picked up automatically.

Inventory

Labels printed at 100 %. Campaign: Launch (the scope is frozen), Scanner, Close (assets never counted become Missing), Resolve the discrepancies.

Depreciation

Depreciation charges: Generate › Validate › Post the depreciation › Post the disposals. A single engine, the accounting's.

Value

Revaluation: the difference becomes a -R1 component, against reserve 144. Impairment: a class-29 provision, reversed on exit.

Taking an asset out

Sale: offer › approval › contract › signature. Retirement: appraisal › committee › approval › retire › scrapping. Theft, loss, destruction: New exit, with the claim. Result = price − NBV.

Who decides

Validation workflows, set by management. With no named approver: management. Nobody approves their own request, except management.