Before starting
Once, the administrator has set the module up (chapter 2):
- Settings › Dossier and threshold: the firm's accounting file is chosen, the capitalisation threshold stays at 500,000 DT excl. VAT;
- Settings › Categories: Default categories has placed the families, among them IT equipment (
MAT-INF), straight-line at 33,33 %; - the file has its 2026 financial year, from 01/01/2026 to 31/12/2026.
October 2026: the purchase
On 05/10/2026, the purchasing team enters and validates the supplier's invoice: one line « Ordinateur portable 14 pouces » (14-inch laptop), quantity 4, 9 800,000 DT excl. VAT, VAT 19 %.
- Assets › Fixed assets, New fixed asset.
- Description « Ordinateur portable 14 pouces », Category IT equipment, Brand and Model.
- The asset comes from: Purchase invoice. The invoice, then its line (« 4 assets left »): the price (2 450,000 DT excl. VAT per asset) and the VAT (465,500 DT, recoverable) come in on their own.
- Acquisition date 05/10/2026, Receipt date 08/10/2026, In-service date 12/10/2026, Warranty end 08/10/2028.
- Number of assets: 4. The summary shows a Gross value of 2 450,000 DT per asset.
- Save the 4 assets.
Four assets are born: IM-2026-000001 to IM-2026-000004, each with its record. On each record, tab Documents, the invoice is uploaded; Print the commissioning report gives PVMS-2026-000001 to have signed.
Place, entrust, label
Assets › Locations: the site « Siège de Tunis » (code TUN), its « Immeuble A », the « 2e étage », and under it the « Bureau Conseil », the « Bureau Direction », the « Salle de réunion »; the « Local informatique » under the building.
Assets › Assignments: IM-2026-000001 is entrusted to a collaborator, Karim. His workstation (Bureau Conseil) is suggested; same site, the asset goes there at once. Have a handover receipt signed is ticked: it is printed, Karim signs it, Signed handover receipt received on 14/10/2026. The next two are done the same way; IM-2026-000004 is assigned to the Local informatique itself.
Inventory › Labels: the four assets are ticked, A4 sheet of 24, Download the PDF, printed at 100 % from the PDF reader, and the labels are stuck on.
Insure
Insurance › Insurance policies, New policy: an « All-risk IT » policy, its period, its annual premium, a limit of 5 000,000 DT, and the covered assets. 000001 and 000002 are ticked; 000003 is covered by an older policy that expires soon.
Insurance › Coverage then shows: two assets Covered, one Covered — expiring soon, and IM-2026-000004 Not insured. It is added to the policy with Edit, and before expiry the older one is Renew-ed.
A battery that dies
On 26/10/2026, the battery of IM-2026-000001 runs down in less than an hour.
- Maintenance › Work orders, New work order: the asset, type Repair, priority Normal, the Problem observed, the provider, an Estimated cost of 150,000 DT. Below the 2 000,000 DT threshold, no approval: order
OT-2026-0001is born Requested. - Schedule for 28/10/2026, then Start: the asset becomes Under maintenance.
- Complete on 28/10/2026, with a 95,000 DT battery and 30,000 DT of labour: 125,000 DT enter the cost register, and the asset is In service again.
Costs › Total cost of ownership now shows, for this workstation: 2 450,000 DT of acquisition, 125,000 DT of maintenance, and its share of the insurance premium.
November: the inventory
Inventory › Campaigns, New campaign « Inventaire annuel 2026 — Siège de Tunis, 2e étage », from 02/11/2026 to 13/11/2026, with a manager and a team of two. Launch: three assets are expected.
At the Scanner, the team reads the labels. Two assets are Present. The third, IM-2026-000003, is found in the meeting room, with Nour: Wrong location, with the place found.
Close: no asset is missing, one discrepancy remains open. In Inventory discrepancies, Resolve, Attach to the place found: the asset is placed in the meeting room by an adjustment transfer closed automatically. The Inventory report prints from Reports.
December: the year's depreciation
On 31/12/2026:
- Depreciation › Depreciation charges, financial year 2026, Generate. For each workstation, 88 days held in 2026: 2 450,000 × 33,33 % × 88 ÷ 365 = 196,875 DT.
- The totals by family are checked, then Validate: the charges are frozen, and each workstation's record shows the padlock.
- Post the depreciation, Entry date 31/12/2026: the entry is posted in the firm's file.
The Fixed assets and depreciation table report for 2026 goes to the auditor, as a PDF.
March 2027: selling one workstation
The firm sells IM-2026-000004 to a client.
- Disposals & exits › Disposal offers, New offer: the asset, the date, a Proposed price (excl. VAT), the Buyer. The offer shows the estimated result on the day's NBV.
- Submit for validation: the NBV stays below 5 000,000 DT, a single level. With no named approver, management decides; the partner validates it in Approvals. The asset becomes To be disposed of.
- Draw up the sale contract, Print the contract, and both parties sign.
- Sign the contract, with the Signing date. The preview gives the NBV on that date and the result on disposal. The policy also covers other assets: it stays in force, this asset leaves it. Sign and take the asset out.
The asset becomes Disposed: its disposal date and price are in the register, its depreciation stops on the signing date, its assignment is ended. At the 2027 year-end, Post the disposals posts the sale's entry together with the year's other exits.